Standard Three-Phase Smart Meter for Battery System
- For monitoring power consumption and export power.
- Smart meter with 6 CTs upgrade: allows monitoring of solar production from existing solar system
|
1 |
$450.00 |
|
Travel Fee Level 1
|
1 |
$250.00 |
|
Travel Fee Level 2
- more than 150km single trip
|
1 |
$500.00 |
|
RCBO Switches Upgrade Single Phase
- For backup circuits, if the existing circuit breaker is an MCB without a "test button," we will need to upgrade the circuit breakers to RCBOs to comply with the updated AS/NZS 3000 standards.
|
1 |
$80.00 |
|
Long Cable Run
- more than 5m but within 10m, no backup
|
1 |
$500.00 |
|
Long Cable Run
- more than 10m but within 25m
|
1 |
POA |
|
Fireproof Board
- Coverage area: 2400mm x 2440 mm
- For customer properties with wooden walls or non-concrete & bricks wall.
|
1 |
$300.00 |
|
Bollard
- Bollards are required if the battery is installed in driveways or car park garages.
|
1 |
$150.00 |
|
Canopy
- UV protected canopy for battery installed in the areas without sheds to protect the battery from overheating.
|
1 |
$400.00 |
|
Double-Story for Solar System
- There will be a surcharge for labour for roof solar panel installation on double-story buildings.
|
1 |
$200.00 |
|
Extra Indoor 12 Poles Sub-Board
|
1 |
$450.00 |
|
Extra Outdoor 12 Poles Sub-Board
|
1 |
$650.00 |
|
Switchboard Upgrade
|
1 |
POA |
|
Extra Split After First 2 Panel Strings
- Extra split charge will apply for panel installation on additional roof split.
|
1 |
$150.00 |
|
Terracotta Tile
- There will be an additional surcharge of labour cost for solar panel installation on roof with terracotta tiles.
|
1 |
POA |
|